Le Tour de Fleece 2013: Day Twenty-Two

Last day in the mountains for the cyclists today, more good scenery! For a change of pace today I thought I would have a go at knitting with my longdraw experiments. This is the 3ply, so far I have tried garter stitch, stocking stitch, 1×1 rib, and 2×2 rib. I am also planning to try some moss stitch, a cable or two, and possibly some lace.

20130720-152041.jpg

Today’s coin is the other side of the old Irish 10p that I showed on Wednesday. No connection to the racing but it is so much fun 🙂

Leave a Reply